GRUPO FMA, your PANGEA Partner in Colombia, has recently moved an extra-large Oil Driller from Colombia to Irak (Umm Qasr Port).
44 trucks were used to transport all the driller parts and containers from Neiva City to Barranquilla Port. After a route of 1,264 Km, the trucks arrived and entered the port successfully. GRUPO FMA had to use 60 TN cranes to lift the bigger parts of the driller and load them into the MV. Some of the parts could not lean on the floor to avoid damages, so the loading process took place directly from truck to vessel.
Below are some pictures of loading and ground transportation.
Pls. visit www.grupofma.com for more information